The full job: footprint, footings and foundation walls treated as one continuous zone before the vapour barrier and pour. It is the cheapest termite work a house will ever have done, because nothing has to be drilled or dug.
Soil treatment before a slab or foundation is covered, for new builds, additions and garage pours across Montgomery County.
Fastest: call (855) 974-4733. Or send this and we call you back.
Pre-construction termite treatment is soil work carried out before concrete covers the ground, so a treated zone sits under and around the finished foundation. It is scheduled between the plumbing rough-in and the pour. Gaithersburg Pest Control arranges it for new builds and additions across Montgomery County, quoted from the plans.
This is the one termite job that is easy while the building is open and awkward forever afterwards. Before the slab goes down, the soil under the footprint, around the footings and along the inside of the foundation walls can be reached directly. Once concrete is over it, the same protection has to be achieved by drilling through finished floors.
In Maryland the species the work is aimed at is the eastern subterranean termite, reported as the species found in the state in an older report quoting state agriculture officials. It lives in the soil and reaches the frame through contact points, so treating the soil before it is sealed in addresses the route rather than the insect.
The job is governed by the construction schedule, not the pest calendar. It has to happen after the grading and the plumbing rough-in and before the vapour barrier and the pour, and it should not be done on soil that is about to be dug up or regraded. Builders who book it late end up either delaying the pour or doing a weaker version of the work.
Treated soil is not a place for anyone to be working, eating or storing materials until it is covered as planned. Keep the site clear during and after the application for as long as the label requires, keep children, pets and site dogs away, and keep applications clear of well heads, septic fields, open trenches to stormwater and any stream on the lot. If rain has moved soil across a treated area, stop and ring (855) 974-4733 rather than pouring over it.
The full job: footprint, footings and foundation walls treated as one continuous zone before the vapour barrier and pour. It is the cheapest termite work a house will ever have done, because nothing has to be drilled or dug.
A smaller footprint, but the critical part is the joint with the existing building. A new slab butted against an old wall creates a fresh route up into the frame, and that junction is the reason additions get termite activity that the original house never had.
Here the work is around the footings and along the walls before backfill, rather than under a slab. The advantage is that the interior stays accessible afterwards, so later inspection and treatment are both easier.
If it's an emergency, call now. For non-urgent pre-construction termite treatment, send the form and we'll call you back.
After grading and the plumbing rough-in, and immediately before the vapour barrier and the pour. That window is usually short. Booking it against the plans rather than the week of the pour is what keeps it from being skipped or done on soil that is still going to move.
The sequence matters because the application has to stay where it was put. If a trench is cut for a late utility run, a downspout line or a landscape change after treatment, the zone is broken at exactly the point a termite would use. Flag any late digging.
Weather is the other scheduling risk. A humid Mid-Atlantic spring can deliver heavy rain between treatment and pour, and water moving across a graded site can carry loose fill with it. If the site has been washed out or regraded, part of the area needs doing again, and that is a conversation to have before the concrete trucks are booked.
Because the soil under a slab is the one place a termite can work completely unseen, and after the pour it can only be reached by drilling through the finished floor. Pre-treatment covers the whole footprint continuously, which is something no post-construction treatment can match.
Think about where the first signs appear in a slab house: a wall base, a garage edge, the bottom of a door frame. By then the colony has already crossed the ground under the building. Pre-treatment is aimed at that crossing.
There is a cost argument too. The treatment is quick on open soil and slow through concrete, and drilling a finished basement or garage floor later is disruptive. None of the figures are published here, but the ordering is not controversial: earlier is cheaper.
Stumps, roots, buried form boards, offcut lumber, cardboard and construction debris inside and around the footprint. Wood left in fill is a food source sitting inside the treated zone, and it is the most common avoidable cause of termite activity in a house only a few years old.
Upcounty lots cleared of mature trees are the ones to watch. Grinding a stump leaves the root system in the ground, and a large root network under a slab is a long-term feeding site. The same goes for the pile of scrap lumber that gets pushed into a trench at the end of a long day.
Grade and drainage belong on the same list. Soil that will finish above the siding line, a downspout that discharges at the footing, and a planting bed built up against the wall all undo good soil work within a few seasons. Setting those right at the build stage costs nothing.
The treated area, the foundation type, the number of separate pours, how much of the perimeter is reachable, site conditions and access for equipment, and whether any area has to be retreated after weather or regrading. No figures are published here; the quote is given from the plans and confirmed on site.
A single clean rectangular slab on a level, dry lot is the simplest version. A stepped foundation on a sloping upcounty lot, with a walkout basement, a garage at a different level and a separate porch pour, is several jobs that happen to share an address.
Retreatment after a washout is the variable nobody plans for. Building a little schedule slack between treatment and pour is the cheapest insurance against it.
No. It protects the part that gets sealed in, which is the part nobody can get back to. The exterior perimeter, the backfill, the landscaping, the deck and the patio all change over the years, and the ongoing attention after the build belongs to those.
A reasonable plan for a new house is pre-treatment before the pour, then exterior monitoring or treatment afterwards, with an inspection whenever something changes the soil against the building. Patios, decks, planting beds and new utility runs are all worth a mention at the next check.
If you are buying a newly built house rather than building one, ask for the pre-treatment record and keep it. Our guide to termite signs in Montgomery County covers what to watch for in a house of any age.
The footprint, the foundation type, the number of separate pours and the site conditions decide the scope. Working from the plans means the visit can be slotted into the build programme rather than squeezed in.
Grading finished, plumbing rough-in in place, trenches and footings formed, and no further digging planned inside the footprint. Treating soil that is going to be moved wastes the application.
The soil within the footprint and along the footings and foundation walls is treated so a continuous zone sits under and around the finished structure. Plumbing and conduit penetrations get particular attention, because they are the gaps the frame will depend on.
The treated soil needs to be covered as scheduled and kept from being dug out, washed out or regraded. If heavy rain disturbs the grade before the pour, say so, because part of the area may need retreating.
A written record of the areas treated and the date, kept with the build file. Builders, buyers and lenders all ask for it later, and reconstructing it after the fact is close to impossible.
Once the building is up and the backfill is final, the exterior perimeter is the part that needs ongoing attention. That is where a monitoring or treatment plan under termite control picks up.
The upcounty is where most of this work sits. New subdivisions in and around Clarksburg and the northern end of Germantown keep adding slabs, garages and porches, and Gaithersburg itself continues to infill around established blocks. Gaithersburg had 27,182 housing units at the 2020 census and has been a city since 1968, so new pours here usually happen next to existing buildings rather than on open ground, which puts the focus on the junction between old wall and new slab.
Site conditions vary sharply across the service area. Communities such as Barnesville, with 68 residential units, and Boyds rely on private wells and septic according to planning documents, which means septic fields, well heads and long service runs to keep clear of. Those details change where equipment can go and where an application must not.
A boundary note for builders working at the edge of the area: Ijamsville is in Frederick County, so the Montgomery County rules referred to elsewhere on this site do not apply to a job there. The state regulator, the Maryland Department of Agriculture, is the same for both.
Not sure if you're covered? Check your ZIP code.
Treatment and monitoring for subterranean termites in Gaithersburg houses, townhouses and additions across Montgomery County.
A written wood-destroying insect inspection for Gaithersburg sales, refinances and peace of mind, reported on Maryland's standard form.
Finding and permanently sealing the entry points into Gaithersburg attics, crawl spaces, soffits and foundation voids.
Inspection-led treatment for household pests in Gaithersburg homes and rentals, with the plan explained before any work starts.
Termite swarmers are winged reproductives that leave a mature colony in spring, usually after warm rain.
Yes, but it becomes post-construction work: an exterior perimeter treatment, a monitored bait system, or drilling through slab and garage floors where needed. The termite control page covers those options.
As close to the pour as the schedule allows, with the grading and plumbing finished. The aim is for nothing to disturb the soil between treatment and concrete.
It is the case for it that is strongest, because the new slab meets the old wall and creates a route that did not exist before. Additions and sunrooms are a common place to find activity in otherwise sound houses.
Rain alone usually does not, but soil that washes out or gets regraded afterwards does, because the treated material is no longer where it was placed. Tell the technician what happened and have the affected area assessed before pouring.
The builder should keep the record in the build file, and the buyer should ask for a copy at settlement. It is the only evidence that the work was done, and it is asked for years later.
Applications are kept clear of well heads, septic fields and anything draining to a stream. On a rural lot that shapes the layout of the work, so the technician needs to know where those are before quoting.